FAQ - Creating PM's

From ExxtremeWiki
Revision as of 12:38, 10 August 2012 by Will (Talk | contribs)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

1. If I have a PM that has multiple pieces of equipment that are due at different times, do I have to set up PM #'s for each peice of equipment?[edit]

1 PM per Equipment, Location or Route
Job Plans can be used on Multiple PM's
Routes can be equipment or location based and can specify an unlimited number of either.
NOTE: A PM that is Route based can cover multiple pieces of equipment with a single PM. This is normally used for small pieces of equipment where you have lots of them that need to be PM'd - often the PM's Job Plans are small and relatively simple - allowing a Maintenance person to complete all of the route in a single shift.[edit]